
OverviewPurging SystemApplicationsCase Study
home > Sectors > Refining > Delayed & Flexi - Coking Unit > Overview
Delayed & Flexi – Coking Unit
Improved Unit Reliability
- Low, Consistent Steam Consumption
- Non-Dependent on Availability of Steam
- Controlled Torque Over Time
- Low Fugitive Emissions with Stem Purge
- Automatic Blocking Systems Available
- Extended Service Life versus Alternatives
Engineered to Industry Standards
- Tested and Certified to API 607 Revision 4 Fire Safe Standard
- Tested and Certified to TA Luft and ISO 5804 Fugitive Emission Standards
- Exceeds Requirements of API 598 and FCI 70.2 Testing Standards
- Full PMI of All Components
- Meets Global Automation Standards including
- ANSI
- ATEX
- GOST
- UIL
- INMETRO
Assured Performance
- Four Year Valve Material and Workmanship Guarantee
- Industry Standard Actuation – Per Customer Specification
- Operates in all Thermal Conditions, Thermal Swings
- Only Eight Mechanical Components in Valve Design
- Service and Support Center Worldwide
- Worldwide Reference Available
Headquarters
5904 Bingle Road
Houston, Texas 77092
United States
+1 713 860 0400
+1 713 860 0499
info@valv.com
Ask the Expert
Barry Hoeffner
Industry Director – Hydrocarbons
+1 713 715 5602
+1 713 907 7919
bhoeffner@valv.com